Test & Examination
Report & Calculation Service
Consultation Service
Reference Information
Contact Us
- Tel.:
- (852) 2496 2202
- Fax.:
- (852) 3753 2918
- E-mail.:
- info@lifeworld.hk
RPE Report
We provide services of Registered Professional Engineers (R.P.E.) / competent persons to conduct inspections and thorough examinations on your lifting appliances and lifting gear used for raising or lowering or as a means of suspension in any industrial undertaking according to Cap. 59J Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations.
Certificate will be delivered upon test results. This particularly important for you to ensure the safety and stability of your lifting appliances and lifting gear.
To accommodate your needs, we offer flexible schedule.
If you would like to know whether your lifting appliances/lifting gear requires inspection or acquire quotation, feel free to contact us for further information.
Your machinery/equipment needs to receive regular checking. Below is a reference for inspection cycles:
Note: ❋ stands for applicable
Certificate will be delivered upon test results. This particularly important for you to ensure the safety and stability of your lifting appliances and lifting gear.
To accommodate your needs, we offer flexible schedule.
If you would like to know whether your lifting appliances/lifting gear requires inspection or acquire quotation, feel free to contact us for further information.
Your machinery/equipment needs to receive regular checking. Below is a reference for inspection cycles:
| ITEM | Form No. (LALGR) | ||||||
|---|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| Crane | * | * | * | ||||
| Crane with anchoring or ballasting devices | * | * | * | * | |||
| Winch,Crab | * | * | * | ||||
| Pulley Block, Ginwheel, Sheerlegs, Pile Driver, Pile Extractor, Excavator, OverheadRunway, Dragline, etc | * | * | * | ||||
| Lifting Gear | * | * | |||||
| Fibre Rope | * | ||||||
| Period | 7 days | after erection | 4年 | 12months | before put into use | 6months | |
| before use or after substantial repari, re-erection, failure, overturning or collapse | |||||||
